For Lincolnshire Constabulary the refurbishment of the main Force control room was achieved through a new steel frame rear extension, full re-cladding of the external walls and re-covering the roof to improve the thermal efficiency and aesthetics of the building envelope.
Internal works comprised refurbishment of the heating, mechanical, electrical, CCTV, communication and UPS systems together with acoustic improvements, joinery replacement, access floors, kitchen and changing facilities.
The project introduced the installation of hostile vehicle mitigation works through a security bund around the building, CCTV systems and detection equipment.
Client: Lincolnshire Constabulary
Role: Lead Consultant, Quantity Surveyor, Design Services, Contract Administrator and CDM Co-ordinator.
Value: £1 Million