For the Old Palace Lincoln Focus was appointed for the remodelling, refurbishment and reintegration of Church House and Edward King’s House which are both Grade II* Listed Buildings.
The project provides office space to meet the needs of the Diocesan Administration, together with facilities for conferences, weddings and retreats, including catering and residential accommodation.
The works have addressed disabled access issues through a new lift serving all floors, and an additional stair flight between first and second floors. These have been constructed from contemporary materials and all works minimise intrusion and impact to the historic palace.
Client: The Diocese of Lincoln
Role: Project Manager, Options Appraisal/Feasibility Study, Design Services, Quantity Surveyor, CDM Co-ordinator and Contract Administrator.
Value: £2.2 Million